DGAC explain about airport


Emerging works on the runway at Mariscal Lamar Airport, is expected to begin later this month. Diego Caceres

On Monday the director of the Directorate General of Civil Aviation, DGCA, Giovanni Dillon, visit the city to explain to local authorities related to Embraer 190 plane incident occurred last TAME April 28 topics.


According to Mayor Marcelo Cabrera, the official will attend the Board of Airport, CORPAC Corporation, and is expected to solve some doubts about the restrictions that prevent operate in wet conditions or lack of calibration approach lights, known by its acronym in English as PAPI.

All this is also related to the report issued from the company Quiport in which it was determined that the technical track conditions are suitable for flying, which does not match the report of the DGAC, which describes various problems such as a drop and poor drainage system.

As for the beginning of works emerging executive director in charge of the CORPAC, Juan Fernandez, he said that could be hired in late August, although this week and sheets jumped on the Public Procurement Portal.

Until the 16th of this month the process will be completed, with the expectation that a procedure known as Recognition of errors that must be resolved in two to four days is given. (JGJ) (I)

Source: http://www.eltiempo.com.ec/noticias-cuenca/188850-dgac-explicara-sobre-aeropuerto/

CONVERSATION

0 comentarios:

Publicar un comentario

Back
to top